WLAN Reference Design with the MAX2830
Abstract: This reference design is a complete RF front-end
2009-02-22 01:15:40
890 [hide][/hide]
2011-07-23 16:20:51
Transmitter Reference Design for a 900MHz Full-Duplex Radio
Abstract: This reference design
2008-08-18 13:47:25
870 
Design Files for FCC Part 90 Reference Design
2021-02-01 09:18:06
0 LED Reference Design Kit:The XMOS LED Reference Design builds on the power of XS1-G4programmable
2009-10-23 16:48:34
15 AD4020 Reference Design Software
2021-01-31 15:20:29
0 Eterna Extended Range Reference Design
2021-02-21 10:41:12
9 Reference Design for a Signal-Lamp LED Driver
Abstract: This application note presents a
2009-06-30 08:13:31
924 
Reference Design for a High-Input-Voltage, High-Output-Current Buck Controller Using the MAX15046
2009-11-08 17:43:05
1016 Abstract: This application note presents a reference design for Power-over-Ethernet (PoE) midspan
2009-04-23 16:11:19
1161 
Reference Design for a PC-Based Oscilloscope
Abstract: This article presents a reference design for a PC-based oscilloscope. The
2009-09-27 11:27:38
801 
printer. The reference design shows how to use a MAX15005 power-supply controller as a SEPIC circuit to obtain a high-variable output volt
2009-03-23 21:28:05
849 
Reference Design Report for a 5 W Charger Using LNK616PG:This engineering report describes a 5 W
2009-06-28 22:33:22
21 Reference Design for a Class-D, 2.1 Channel, Audio Amplifier for an MP3 Player Docking Station
2009-03-02 14:26:33
1601 arduino-Due 原始 設(shè)計圖 arduino-Due-Reference-design
2016-01-11 14:41:31
46
Reference Design for a High-Current Power Supply with Lossless Current Sensing Using the MAX5060
abstract: This reference design shows ho
2009-05-02 10:09:29
1266 
移動WiMAX—WiBro技術(shù)剖析
無線寬帶接入(WiBro)專為高速無線寬帶用戶定制,被人們視作移動WiMAX。WiBro商用服務(wù)針對大容量數(shù)據(jù)的發(fā)送與接收,利用新型的網(wǎng)絡(luò)技術(shù),在
2009-05-21 01:20:03
382 Reference Design Report for a 2.78 W USB Charger Using LNK613DG:This engineering report describes a
2009-06-28 22:34:00
25 Reference Design Report for a 36 W Continuous, 72 W Peak Power Supply Using PKS606YN
This document
2009-06-28 22:41:13
21 Reference Design for Switching VGA Signals in a Laptop
Abstract: This application shows how
2009-03-23 22:06:01
969 
MAX3580 DVB-T Reference Design
Abstract: The MAX3580 DVB-T reference design meets NorDig and MBRAI requirements. This NIM design i
2008-08-18 14:09:33
1627 
3GPP LTE Turbo Reference Design,學(xué)習(xí)4G/LTE的好資料
2016-06-06 10:29:29
3 are put to use in this reference design for laser and thermoelectric cooler control in EDFA and Raman optical amplifiers. The resulting c
2010-06-01 10:38:07
6 ARD Audio DA7212 Reference Design 原理圖
2023-07-04 19:58:36
0 ARD Audio DA7212 Reference Design 原理圖
2023-02-03 19:26:19
0 MAX2165 DMB-TH USB Dongle Reference DesignAbstract: This compact USB dongle design combines a
2008-08-18 14:14:33
1689 
Reference Design for a 5S2P AR111 Lamp LED Driver
Abstract: This application note presents a
2009-06-30 08:12:25
991 
AD9217 and Intel Stratix 10 Interoperability report and Reference Design
2021-01-29 15:15:31
8 電子發(fā)燒友網(wǎng)站提供《HW3182 Hardware Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 11:32:45
0 電子發(fā)燒友網(wǎng)站提供《HW2173 Hardware Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 11:13:21
0 電子發(fā)燒友網(wǎng)站提供《HW2171B Hardware Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 10:25:35
0 電子發(fā)燒友網(wǎng)站提供《HW2000B Hardware Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 10:24:26
1 電子發(fā)燒友網(wǎng)站提供《Sub 1GHz Antenna Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 10:52:53
0 電子發(fā)燒友網(wǎng)站提供《HW2181B Hardware Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 10:27:51
3 電子發(fā)燒友網(wǎng)站提供《2.4GHz Antenna Reference Design應(yīng)用筆記.pdf》資料免費下載
2022-09-22 10:26:43
3 reference design for mainstream hybrid LCD TV in the European market. It lets you offer enhanced features at a lower system cost. And like it
2010-03-01 22:39:22
20 Reference Design for a PC-based Temperature-Measurement System
Abstract: The MAX6603 and MAX1396
2009-09-27 10:51:27
997 
Abstract: This reference design demonstrates the use of the MAX9736 Class D audio amplifier in a
2009-05-05 09:51:31
1772 AD9355:WiMAX/WiBro RF MxFE MISO收發(fā)器初步數(shù)據(jù)表
2021-05-25 10:49:15
3 AD9354:WiMAX/WiBro RF MxFE MISO收發(fā)器特殊2 PG數(shù)據(jù)表
2021-05-25 20:18:47
9 8T49N281-003 數(shù)據(jù)表 Tilera Reference Design
2023-07-10 20:50:13
0 8T49N281-003 數(shù)據(jù)表 Tilera Reference Design
2023-03-24 19:00:38
0 WiBro(WirelessBroadbandaccessservice)是WiMAX的一員,就像TD-SCDMA屬于3G家族一樣。WiBro是三星電子與韓國電子通信研究院(ETRI)、與SK電訊等
2017-11-24 20:51:32
543 Reference Design of a 1-Wire Bidirectional Voltage-Level Translator for 1.8V to 5V
Abstract
2009-11-16 16:14:14
1303 
AD9356:WiMAX/BWA/WiBro/LTE RF MxFE 2×2 MIMO收發(fā)器產(chǎn)品手冊
2021-04-30 15:38:35
7 DVB-T Receiver Reference Design with the MAX3580
Abstract: The MAX3580 DVB-T reference design meets NorDig 1.0.3 and
2008-10-01 00:27:00
1616 
High Speed PCB Design--Ride the Wave WorkshopPost Route Analysis of a HighSpeed PCB DesignDesign/Analysis forPower Delivery System (PDS)
2009-09-26 18:30:58
12 Array) designs, methodologies, and design techniques.Whether my client is on the Fortune 100 list or is just a start-upcompany, th
2009-07-11 14:47:34
4
松下TH-42PHW6EX、TH-42PHD6EX、TH-42PHD6BX、TH-42PHD6UY等離子彩電開關(guān)電源電路
2009-01-22 23:40:41
718 
松下TH-65PHD8BK TH-65PHD8EK TH-65PHD8UK等離子彩電開關(guān)電源電路
2009-01-22 23:42:23
826 
DSP Builder Reference Manual:The blocks in the AltLab library are used to manage design hierarchy
2010-02-16 12:14:25
14 ZBT SRAM Controller Reference Design for APEX II Devices
As communication systems require more
2009-06-14 09:20:09
17 Nexperia IP Camera Reference Design for security and urveillance applications,PNX1502 pdf
2010-03-04 14:55:30
33 TH2613X與TH2617X型多路電容器掃描測試系統(tǒng)
2009-11-16 17:14:24
13 Reference Design Ensures Dynamic Output Voltages for a Print-Head Power Supply
Abstract
2009-07-18 11:05:49
965 
5th Worksh
2010-07-01 18:49:10
6 This reference design (RD) features a fullyassembled and tested surface-mount printed circuitboard
2010-09-19 10:54:28
67 NR4211TH 數(shù)據(jù)表
2023-07-14 18:57:39
0 NR4211TH 數(shù)據(jù)表
2023-04-04 19:24:14
0 什么是通孔? 通孔( TH )是多種名稱的孔 - 通孔,通孔,通孔,鍍通孔等 - 通孔( TH )是 PCB 上的孔,可以一直鉆孔,擴孔或銑削。這意味著,如果您猜測圖像中心的孔是 TH ,那是
2020-11-08 21:24:02
4306 View the reference design for AN-CIPOS-Reference Board-4. http://www.makelele.cn/soft/ has
2021-08-03 10:28:01
8 View the reference design for AN-CIPOS-Reference Board-3. http://www.makelele.cn/soft/ has
2021-09-02 12:00:45
2 View the reference design for AN-CIPOS-Reference Board-1. http://www.makelele.cn/soft/ has
2021-09-02 11:57:28
10 View the reference design for AN-CIPOS-Reference Board-2. http://www.makelele.cn/soft/ has
2021-09-02 12:19:01
9 UWB通信系統(tǒng)的TH-PPM信號產(chǎn)生與接收研究,UWB通信系統(tǒng)的TH-PPM信號產(chǎn)生與接收研究
2016-03-01 10:08:19
35 KENWOOD TH28電路圖:
2012-02-28 15:17:31
163 TH222A實驗板資料手冊免費下載。
2022-07-01 09:28:46
1
松下TH-42PHD5、TH-42PHW5等離子彩電開關(guān)電源電路
2009-01-22 23:40:02
745 
Abstract: This application shows how the MAX4885E low-capacitance VGA switch can be used to perform the switching function in a laptop computer. The MAX4885E draws nearly zero current, fits into a 4mm x 4mm package, and incorporates most o
2009-04-20 11:02:23
750 
同惠數(shù)字電橋TH2827系列是具有多種功能和更高測試頻率的新型LCR數(shù)字電橋,體積小緊湊便攜,便于上架使用。TH2827A/TH2827B/TH2827C數(shù)字電橋測試儀基本精度為0.05%,測試頻率
2022-11-25 16:47:49
382 
2015-04-16 11:38:29
11
評論